In modern construction, particularly within urban environments where space is limited and underground work is often required, retaining wall systems play a critical role in ensuring the stability of excavations and surrounding structures. Two commonly employed techniques are contiguous piling and secant wall construction.
Though similar in their use of bored piles, they differ significantly in design, performance, and application. Understanding these methods is essential for engineers, contractors, and developers working in complex ground conditions.
Contiguous piling involves the installation of a series of closely spaced, vertical concrete piles that are cast in situ using bored piling techniques. These piles are constructed with small gaps between them, typically ranging from 50 to 150 millimeters. While these gaps do not form a watertight barrier, they provide sufficient lateral support to hold back soil, making contiguous piling suitable for dry or cohesive soils where water ingress is minimal. The construction process typically begins with drilling a borehole using a rotary auger, followed by the placement of reinforcement and concrete. Once one pile is completed, the adjacent pile is installed next to it with precise alignment to maintain the small spacing.
This method is widely favored for its speed, relative cost-efficiency, and suitability in a variety of ground conditions. Contiguous piling is often used for basement construction, retaining walls, and slope stabilization. It allows construction to proceed safely near existing buildings, infrastructure, and public spaces. However, because the system does not offer full water retention, it may require supplementary dewatering or grouting in groundwater-rich environments. Its main advantage lies in its structural support capabilities, especially when minimal ground movement is essential.
In contrast, secant wall construction is a more robust technique that produces an interlocking wall by overlapping adjacent concrete piles. The process involves drilling a primary series of unreinforced concrete piles first. Once these have set, secondary piles are drilled in between, cutting into the primary piles and overlapping them to form a continuous wall. These secondary piles are typically reinforced, giving the system both structural integrity and water resistance. The overlapping design creates a virtually watertight barrier, which makes secant walls ideal for excavations below the water table or in areas with unstable ground conditions.
Secant walls offer excellent performance in terms of both water cutoff and structural support. They are especially beneficial in deep excavations or when constructing basements in high water table zones, such as coastal areas or floodplains. The precision required for overlapping the piles means that secant wall construction is more time-consuming and costly than contiguous piling. It also demands higher levels of technical expertise and equipment accuracy. Despite these challenges, the system is frequently chosen for its reliability in difficult conditions where other solutions might fail.
The decision between contiguous and secant wall construction is primarily influenced by the site’s geotechnical characteristics, groundwater conditions, and structural requirements. Contiguous piling is generally more economical and quicker to install but limited in its ability to resist water ingress. Secant walls, while more complex and expensive, provide superior water tightness and structural robustness. Both systems can be designed as either temporary or permanent works, depending on the needs of the project.
In conclusion, contiguous piling and secant wall construction are critical tools in the geotechnical and structural engineer’s arsenal. Each method has its place in modern construction, offering tailored solutions for excavation support and ground retention. As urban development intensifies and more construction ventures underground, these technologies will continue to play a vital role in safe and efficient project delivery. Understanding their differences and applications ensures that the right approach is chosen to meet both the technical and environmental challenges of any given site.